SR-2026-064 · Furniture · Plant stand · August 2026
Eight plant stands in a black metal frame — a powder-coat product, so coating thickness and weld dressing were the checks.
Receiving photographs




Photographs taken at our consolidation warehouse as the lot was received and checked. Container numbers, shipping labels, supplier marks and brand markings are masked; the lot is shown as it arrived, not restyled.
How this order was run
- Booked production against the client's delivery date and worked backwards from the sailing, not forwards from the order.
- Gave the lead time that was realistic for this category rather than the lead time that wins the order.
- Released the lot only after the receiving set had been opened, counted and photographed, and sent the photo set out with the packing list.
What was checked at receiving
This is the plant stand check sheet — the same list every order in this category goes through before the container is released.
- Leg splay and twist checked with the unit standing on a flat reference — a table that rocks at the factory will rock on the client's floor
- Load applied to the top and to the apron joints, at the point where the leg meets the frame
- Finish checked on the top under raking light, and on the underside and inner faces where factories economise
- Glass and stone tops inspected for chips at the edge and measured for thickness before packing
- Height and footprint verified against the approved drawing, not against the catalogue photograph
How it was packed
- Top wrapped in foam and corner-boarded, boxed separately from the base where the design allows
- Legs and stretchers bagged with the hardware and taped inside the main carton
- Glass or stone packed in its own crate with a foam gasket on all four edges
- One carton per lot dropped and stack-tested before the container closes
The note
Tables fail on the top surface and on the leg joint. Both are visible on arrival and both are the client's most expensive complaint — a replacement top usually means a second shipment, not a second part.
It is why a table order is inspected standing up, on a flat floor, with the top loaded — the three things a factory photograph never shows.